Situated on a narrow site with both width and height restrictions keeping the structural elements to a minimum was paramount. We decided to proceed with a cross laminated timber construction which allowed us to maximise space and minimise construction depth.
The structure was built in 3 days providing a platform and watertight environment from an early stage.
Architect | Eldridge Smerin |
---|---|
Client | Charterhouse Ventures Ltd |
Client | Charterhouse Ventures Ltd |